In this paper a method has been proposed to reduce the standing phase angle SPA which is one of the most common problems during restoration process of power system Rescheduling method of generation units has been used to prevent problems caused by excessive SPA Also, the effect of thyristor controlled series compensator TCSC which is one of the series type of flexible alternating current transmission systems FACTS devices has been investigated on minimizing deviation of active power generated by thermal units effectively Particle swarm optimization PSO algorithm has been used to satisfy operational constraints and optimize objective function, which is the deviations of real power Also, acceptable SPA limit has been added as a new constraint to the optimization problem Effectiveness of the proposed method has been tested on IEE ۳۹ bus test system and the results are evaluated
کلیدواژهها
نویسندگان
شیوه ارجاع
Sadoughi، Mahmood و Kashfi، Rasoul و Esmailzadeh، Mohammad و Momen، Hojjat و Momen، Amirabbas و Sabaghiyan، Alireza،1400،Optimal TCSC Positioning and Sizing to Reduce the Standing Phase Angle in the Repair Process Using the PSO Optimization Algorithm،هشتمین کنگره ملی تازه های مهندسی برق و کامپیوتر ایران،تهران
ارائهشده در
مجموعه مقالات نهمین کنگره ملی تازه های مهندسی برق و کامپیوتر ایران29 آبان 1401 · تهران