چکیده مقاله
In this paper, the stages of the process of value engineering, which includes information gathering,determination of the value criterion, the initiative, the evaluation of ideas, and eventually the extension ofthe selective idea, are introduced Also, the actions taken by the value engineering method in the Kuchridam project, which are in the direction of the water transfer project The watershed of Dez River is locatedin Qom Rd, is being analyzed
کلیدواژهها
نویسندگان
شیوه ارجاع
Hajizadeh, Alireza and Lakzadeh, Masoud and pooraskari, Hesamadin and moeinadini, pooya,1402,studying the value engineering method in theimplementation of dams,The first international conference on advanced research in civil engineering, architecture and urban planning
ارائهشده در
مجموعه مقالات اولین کنفرانس بین المللی تحقیقات پیشرفته در مهندسی عمران، معماری و شهرسازی20 تیر 1402