چکیده مقاله
Construction of breakwaters is a costly operation involving large volumes of rock, or rock and concrete The breakwater profile, method of operation and the project environment determine the plant and material requirement Designing a breakwater with its construction, economically and technically, in mind calls for the appreciation of material and plant availability and the price of procurement In this paper it is argued that in places where the plant supply problem is overwhelming, a material rock oriented design approach should be adapted In addition some common supply problems and construction techniques are discussed
کلیدواژهها
نویسندگان
شیوه ارجاع
A.A.Khodayari, and A. Alikhani, ,1382,The Construction Aspects of Breakwaters,6th International Conference on Civil Engineering,Isfahan