The construction industry is one of the most important and greatest sectors that boosts a country's GDP One of the existing challenges in this industry is the presence of activities and processes that do not add any value non value added activities ; in contrast, they cause productivity loss and increase waste Engineers are seeking ways that improve productivity continuously; One of the methods to approach this goal is using lean/Toyota construction Lean construction has several tools; value stream mapping is one of the tools that contributes to execution in addition to planning and improves productivity and sustainable development In this article, the current state map is generated by observing the sequence of the processes and the collected data that is gathered through time study and inquiring from human resources In case of analyzing and giving solutions to reach the future state, the model of ceiling slab execution was developed in Arena software; Then, the future state was mapped In conclusion, by improving processes by better procurement and changing the number of resources such as human resources and machines, productivity evolved about 52 percent and lead time decreased by 45 percent
کلیدواژهها
نویسندگان
شیوه ارجاع
Farahi, Ali and Mirvalad, Sajjad and Ghoddousi, Parviz,1404,Productivity improvement by using Value Stream Mapping: Case study of ceiling construction,14th International Congress on Civil Engineering,Tehran
ارائهشده در
مجموعه مقالات چهاردهمین کنگره بین المللی مهندسی عمران29 مهر 1404 · تهران