CONDITIONS IMPACTING UNDERGROUND PROJECTS

CONDITIONS IMPACTING UNDERGROUND PROJECTS

چکیده مقاله

To develop a tunnel PROJECT is more than to just produce drawings to visualize a structure which later should become a tunnel The tunnel developer has to be the manager of the tunnel project including construction, as development is a management tool in design and construction As tunnel failure analysis show, financial conditions are major factors impacting tunnel development and management by design summarizes the state of the art of contracting in tunnelling, including both conventional and mechanized tunnelling A detailed brief description will be given in regard to development stages, contractual implications, and project organization Fundamental requirements for the development of an underground structure are evaluation and classification of ground conditions with respect to particular project requirements design with subdivisions in stages, following the project and construction development, which provides the framework for a range of potential applications construction methods suitable for standard plant, equipment and material backchecking of predictions by geotechnical monitoring and adjustment to the conditions encountered flexible contractual models for fair compensation, Demand for proper developed Underground Works has been continuously growing since decades Conventional Tunnelling Method is well suited for tunnelling in difficult, complex and changing geological and geotechnical conditions The main purpose is to minimise construction cost by selecting optimum driving cross section, driving methods and lining during the design and construction phases During tunnel excavation simultaneous and joint decision by the contract partners must be realized within predetermined limits to manage flexible response to changing ground and ground behaviour conditions Tunnelling needs trained, qualified and experienced owners, designers and contractors, it needs qualified and experienced engineers on site, and qualified and experienced workforce It needs a suitable design as well as a suitable contract model This goes hand in hand with a contract system which had to be developed for being able to cope with changes in ground behaviour together with the character and scope of the works in a fair and objective way In the past most tunnels have been excavated using Conventional Tunnelling Methods The risk of cost overrun and schedule delays caused by uncertainties of the ground must be identified in the very early beginning of the project development The risk register needs to be developed and continuously further developed during the project development

نویسندگان

شیوه ارجاع

Wagner, Harald,1390,CONDITIONS IMPACTING UNDERGROUND PROJECTS,09th Iranian Tunneling Conference,Tehran

ارائه‌شده در

پوستر مجموعه مقالات نهمین همایش ملی تونل مجموعه مقالات نهمین همایش ملی تونل10 آبان 1390 · تهران
ادامه مسیر پژوهش

مقالات مرتبط

مقاله کنفرانسی سال ۱۳۹۰ ۶,۸۳۸ مشاهده

بررسی متدولوژی اجرای سازه های زیرزمینی به روش پیشرفته (Top-Down Method)

عملیات ساخت سازه های زیرزمینی بروش سنتی که با روش گودبرداری و اجرای فونداسیون سازه زیرزمینی آغاز با ساخت…

سازه زیرزمینیBottom-Up MethodTop-Down Method
مقاله کنفرانسی سال ۱۳۹۰ ۴,۳۲۹ مشاهده

تعیین شاخصهای پیش ارزیابی و ارزیابی HSE پیمانکاران در الزامات قرار دادی براساس نوع پیمان

کاردر محیط های پیمانکاری به لحاظ تنوع کار حضور گروههای مختلف کاری و نیزعدم آشنایی کامل پیمکانکار با محیط…

مدیریت HSEقرار دادپیمانکاران
مقاله کنفرانسی سال ۱۳۹۰ ۴,۱۴۳ مشاهده

چارچوبی برای تعیین ساختار شکست کار WBS پروژههای تونلسازی

ساختار شکست کار WBS یکی از اساسی ترین مفاهیم مدیریت پروژه است که پایه و اساسی را برای تعریف محدوده کار پ…

تونلسازیساختار شکست کارشبکه های عصبی
مقاله کنفرانسی سال ۱۳۹۰ ۴,۰۸۷ مشاهده

نقش مطالعات زمین شناسی مهندسی و ژئوتکنیک درتونلسازی مکانیزه در شرایط دشوار زمین شناسی

با افزایش نیازهای جوامع بشری به ابرسازه های مهندسی تقاضا برای ساخت سازه های زیرزمینی بزرگ مانند تونلهای…

زمینهای نامناسبتونلسازیزمین شناسی مهندسی
مقاله کنفرانسی سال ۱۳۹۰ ۳,۷۵۲ مشاهده

بررسی روش اجرای تزریق تماسی در تونل انتقال آب کاشان در شرایط آبدار

تونل انتقال آب گلاب که به منظور آبرسانی به شهر کاشان طراحی شده است طولی در حدود 10 کیلومتر را دارا می با…

شن نخودیدوغاب سیمانسگمنت
مقاله کنفرانسی سال ۱۳۹۰ ۳,۶۱۸ مشاهده

مطالعات زمین شناسی مهندسی و ژئوتکنیکی در طرح های تونلسازی

از آنجایی که برای طراح و سازند تونل سنگ یا خاکی تونل در میان آن ساخته می شود حکم مصالح ساختمانی را دارد…

زمین شناسی مهندسیمطالعات میدانیژئوتکنیک