مقاله کنفرانسی سال ۱۳۹۰ انگلیسی

Tunnel Face Stability Analysis in Soft Ground in Urban Tunneling by EPB Shield (Case Study : 7th Line in Tehran Metro)

Tunnel Face Stability Analysis in Soft Ground in Urban Tunneling by EPB Shield (Case Study : 7th Line in Tehran Metro)

چکیده مقاله

Traffic congestion and environmental factors are creating a demand for greater utilization of underground spaces in urban areas In mechanized excavation of subway tunnels, the Earth Pressure Balanced Shield EPBS has been developed in the recent decades for managing the instability of the excavation profile in complicated geotechnical conditions in urban areas During the advancement of an EPBS, the face stabilizing pressure is one of the most important factors of critical and principle to be evaluated correctly In tunneling by EPBS, high face pressure often leads to surface upheaval whereas low face pressure leads to sudden collapse of the face and ultimately settlement of the surface Both of these misevaluated pressures may cause the damages which followed by pert of time and finance This paper is discussed about urban tunneling by EPBS in soft ground conditions and focused on calculation of face stabilizing pressure applying to the case of 7th line in Tehran metro project Face support pressure is estimated by most current methods of limiting equilibrium analysis and limiting analysis in excavated parts two stations of direction with different and difficult geotechnical conditions Obtained results compared to EPBS operational results which showed the results of Broere analytical method is most attractive and realistic among others For one of the excavated stations calculated value of the Broere analytical method obtained 78 406 KPa and EPBS actual value was equal to 81 01 KPa Due to results verification that illustrate a good adjustment with the actual values, quantity face stabilizing pressure is predicted for some of the alignment unexcavated stations S7, V7, W7 and X7 which can be used in built procedure Maximum value was quantity 246 351 KPa for station V7 and minimum value obtained quantity 25 866 KPa for station W7

کلیدواژه‌ها

face-stabilizing pressure EPBS analytical method Tunneling face stabilizing pressure 7th line of Tehran metro

نویسندگان

تصویر J. Mohammadi

J. Mohammadi

Department of Mining Engineering, Islamic Azad University Tehran South Branch, Iran,

تصویر K. Shahriar

K. Shahriar

Department of Mining, Metallurgy and Petroleum Engineering, Amirkabir University of Technology

تصویر P. Moarefvand

P. Moarefvand

Department of Mining, Metallurgy and Petroleum Engineering, Amirkabir University of Technology

تصویر S Hosseini

S Hosseini

Department of Mining Engineering, Islamic Azad University Tehran South Branch, Iran,

شیوه ارجاع

Mohammadi, J. and Shahriar, K. and Moarefvand, P. and Hosseini, S,1390,Tunnel Face Stability Analysis in Soft Ground in Urban Tunneling by EPB Shield (Case Study : 7th Line in Tehran Metro),09th Iranian Tunneling Conference,Tehran

ارائه‌شده در

پوستر مجموعه مقالات نهمین همایش ملی تونل مجموعه مقالات نهمین همایش ملی تونل10 آبان 1390 · تهران
ادامه مسیر پژوهش

مقالات مرتبط

مقاله کنفرانسی سال ۱۳۹۰ ۶,۸۳۸ مشاهده

بررسی متدولوژی اجرای سازه های زیرزمینی به روش پیشرفته (Top-Down Method)

عملیات ساخت سازه های زیرزمینی بروش سنتی که با روش گودبرداری و اجرای فونداسیون سازه زیرزمینی آغاز با ساخت…

سازه زیرزمینیBottom-Up MethodTop-Down Method
مقاله کنفرانسی سال ۱۳۹۰ ۴,۳۲۹ مشاهده

تعیین شاخصهای پیش ارزیابی و ارزیابی HSE پیمانکاران در الزامات قرار دادی براساس نوع پیمان

کاردر محیط های پیمانکاری به لحاظ تنوع کار حضور گروههای مختلف کاری و نیزعدم آشنایی کامل پیمکانکار با محیط…

مدیریت HSEقرار دادپیمانکاران
مقاله کنفرانسی سال ۱۳۹۰ ۴,۱۴۳ مشاهده

چارچوبی برای تعیین ساختار شکست کار WBS پروژههای تونلسازی

ساختار شکست کار WBS یکی از اساسی ترین مفاهیم مدیریت پروژه است که پایه و اساسی را برای تعریف محدوده کار پ…

تونلسازیساختار شکست کارشبکه های عصبی
مقاله کنفرانسی سال ۱۳۹۰ ۴,۰۸۷ مشاهده

نقش مطالعات زمین شناسی مهندسی و ژئوتکنیک درتونلسازی مکانیزه در شرایط دشوار زمین شناسی

با افزایش نیازهای جوامع بشری به ابرسازه های مهندسی تقاضا برای ساخت سازه های زیرزمینی بزرگ مانند تونلهای…

زمینهای نامناسبتونلسازیزمین شناسی مهندسی
مقاله کنفرانسی سال ۱۳۹۰ ۳,۷۵۲ مشاهده

بررسی روش اجرای تزریق تماسی در تونل انتقال آب کاشان در شرایط آبدار

تونل انتقال آب گلاب که به منظور آبرسانی به شهر کاشان طراحی شده است طولی در حدود 10 کیلومتر را دارا می با…

شن نخودیدوغاب سیمانسگمنت
مقاله کنفرانسی سال ۱۳۹۰ ۳,۶۱۸ مشاهده

مطالعات زمین شناسی مهندسی و ژئوتکنیکی در طرح های تونلسازی

از آنجایی که برای طراح و سازند تونل سنگ یا خاکی تونل در میان آن ساخته می شود حکم مصالح ساختمانی را دارد…

زمین شناسی مهندسیمطالعات میدانیژئوتکنیک