Austrian Tunneling is mainly applicable for big section tunnels The tunnel is excavated step by step in thistechnique Furthermore, forepoling, jet grouting and freezing are the techniques applied to construct falling tunnels;however, Austrian tunneling should not be used alone in medium section tunnels such as water conveyance tunneland falling tunnels As a result, the authors have introduced a new technique called Right Left technique In thistechnique, first forepoling, also known as tube umbrella, was used to strengthen tunnel Then, having divided tunnelinto two left and right sections, the right section was excavated exactly the size of half a steel frame and shotcretetechnique was immediately used The same technique was applied to the left section Then, the face was advanced bydrum cutter up to the area excavated by steel frame The operation cycle was completed in this way Relative stabilitywas obtained by using this technique In this paper, technical reasons for choosing this technique was presented Furthermore, using Flac 3D, its convergence was compared with that of the Austrian
کلیدواژهها
نویسندگان
شیوه ارجاع
Ghaemi, Masoud and Khalili, Alireza and Matloobi, Majid and Faramarzi, Ahmad,1396,New Approach in Tunneling Construction Using the Forepooling Technique,12th Iranian & 3rd Regional Tunnelling Conference,Tehran
ارائهشده در
مجموعه مقالات سومین کنفرانس منطقه ای و دوازدهمین کنفرانس تونل ایران6 آذر 1396 · تهران