چکیده مقاله
this paper considers a multi skilled project scheduling problem that is newly developed form of Resource constraint project scheduling problem RCPSP The main margin in such problems, compared with the classical RCPSP, is related to the given resource type In fact, resources in MRCPSP are human with different skills Each resource can only use one of its skills in a time unit To do each activity in MPCPSP, different skills will be required Additionally, the problem has two objective functions, in which the first one namely makespan is to minimize the project completion time The second one, however, tries to minimize the total deviation of resource usage called resource leveling Due to the complexity, two eminent meta heuristic algorithms called NSGA II and SPEA II are employed To represent the performance of the algorithms, a set of problem with different size are applied to the algorithms Finally, the efficiency of the algorithms is compared with different methods
کلیدواژهها
نویسندگان
شیوه ارجاع
Ebrahimzadeh, M and Arjmand, Masoud and Najafi, A.A,1396,Modeling a bi-objective multi-skilled project scheduling problem to minimize resource leveling and makespan criteria,3th Internatioal Conference on Industrial and Systems Engineering,Mashhad
ارائهشده در
مجموعه مقالات سومین کنفرانس بین المللی مهندسی صنایع و سیستمها (ICISE ۲۰۱۷)22 شهریور 1396 · مشهد