This study addresses the resource constrained project scheduling problem with transfer time and cost and discounted cash flows which aims at maximizing the net present value NPV of all cash flows of the project A positive and a negative cash flow is associated with each activity furthermore, a cost for holding and transferring the resources between activities has been considered We assume that precedence relations are zero lag finish to start relations and the durations and resource transfer times of activities are known and deterministic in advance We formulate this problem as a mixed integer non linear program and to verify the proposed model, a numerical example is solved in small size
کلیدواژهها
نویسندگان
شیوه ارجاع
Naderi Varandi, Khosro Parviz and Sedaghatnia, Amir and Iranmanesh, Seyed Hossein,1399,Modeling and solving the resource constrained project scheduling problem with transfer times and costs and discounted cash flows,6th International Conference on Industrial and Systems Engineering,Mashhad
ارائهشده در
مجموعه مقالات ششمین کنفرانس بین المللی مهندسی صنایع و سیستمها (ICISE ۲۰۲۰)19 شهریور 1399 · مشهد