One of the most important challenges in recent decades has been the issue of energy and sustainable resource supply Currently, nearly all of the world's population has accepted that by the end of this century, fossil fuel resources will be depleted The best alternative option will be renewable energies, especially solar energy On the other hand, it must be acknowledged that different regions of the world have varying capabilities for producing and utilizing solar energy; therefore, it is necessary to identify these energy production capabilities Andimeshk County, located in Khuzestan province, has the best location for establishing a solar power plant in this province In this research, a one megawatt power plant has been modeled using RETScreen software, examining topics such as payback period, internal rate of return IRR , net present value NPV , and the amount of carbon dioxide emissions reduction Ultimately, considering the conditions taken into account, the payback period according to the power purchase agreement at a bidding price of 0 073 per kilowatt hour is approximately 3 years, and it is estimated that around 1,009 tons of carbon dioxide emissions will be reduced annually in the region
کلیدواژهها
نویسندگان
شیوه ارجاع
Shafiee, Mojtaba and Elahi, Farshid and Miraali, Sara and Ghalavand, Reza,1403,Modelling and Analysis of a 1-Megawatt Solar Power Plant in Andimeshk Using RETScreen Software,20th International Conference on Innovation and Research in Engineering Sciences
ارائهشده در
مجموعه مقالات بیستمین کنفرانس بین المللی نوآوری و تحقیق در علوم مهندسی25 اسفند 1403