In tunneling projects using tunnel boring machines TBM , there is a great risk of cost overruns and schedule delays, so proper management and planning of these projects can save both budget and time The longitudinal nature of tunneling projects makes them a dynamic system, so that, the more the machine goes ahead, the longer the distance of material being transported Consequently trains traveling time will be increased and if the transportation system is not empowered appropriately, the TBM will become idle and the project will be delayed To address this issue, this article introduces a dynamic simulation model using system dynamics that represents processes involved in a TBM tunneling project The project processes are analyzed, focusing on efficient and timely material transportation Based on the model results, resources will be allocated properly and as a consequence project performance will be improved Finally with an example the developed model is examined
کلیدواژهها
نویسندگان
شیوه ارجاع
farshchian, mohammad mahdi and heravi, gholamreza,1391,Management of Tunnel Construction Projects with TBM: A System Dynamics Approach,9th International Congress on Civil Engineering,Isfahan
ارائهشده در
مجموعه مقالات نهمین کنگره بین الملی مهندسی عمران19 اردیبهشت 1391 · اصفهان