چکیده مقاله
In this study, a multi period Mixed Integer Linear Programming is developed to optimize a closed loop supply chain in the plastic box manufacturing industry The supply chain includes multiple product types, a production center, several Distribution centers DCs , and Original Equipment Manufacturers OEMs as the final consumers The distribution centers handle the management of new products, returned products in good condition, and products requiring refurbishment The model assumes predetermined locations for production and distribution centers and focuses on optimizing resource allocation and material flow over several consecutive time periods The primary objective is to minimize the total costs related to production, refurbishment, inventory holding, transportation, raw material procurement, and electricity consumption The model incorporates periodic constraints on electricity quotas and stepwise discounts on raw material purchases Additionally, penalty costs associated with product shortages and environmental costs arising from production and refurbishment processes are considered The results demonstrate that the proposed multi period approach effectively ensures optimal resource allocation in each period and significantly reduces the total costs of the closed loop supply chain Specifically, when a similar model is implemented without accounting for the return of healthy and refurbished products, costs increase substantially Moreover, the model facilitates improved product lifecycle management and reduces environmental impacts through effective management of the returned product flows
کلیدواژهها
نویسندگان
شیوه ارجاع
Khooniki, Mostafa and Neghabi, Hosein and Hosseini, Zahra Sadat,1404,Multi Period Closed-Loop Supply Chain Modeling for Plastic Box Production,11th International Conference on Industrial and System Engineering,Mashhad
ارائهشده در
مجموعه مقالات یازدهمین کنفرانس بین المللی مهندسی صنایع و سیستم ها2 مهر 1404 · مشهد