Risk Management of Knowledge Management Implementation Project in an Organization under the Corona Virus (COVID-19)Situation – Case Study of "Dena Holding"

Risk Management of Knowledge Management Implementation Project in an Organization under the Corona Virus (COVID-19)Situation – Case Study of "Dena Holding"

چکیده مقاله

Regarding the benefits provided for organizations by Knowledge Management KM , they need KM Implementation KMI to use the benefits It should be paid attention that almost all projects, including KMI project in an organization, are affected by some risks and uncertainties on the way to achieve their goals Therefore, Risk Management RM plays a crucial role in all projects, including the mentioned project Considering the changes in organizations resulted from the Coronavirus COVID 19 Pandemic CP , the necessity to manage the risks specifically caused by this situation is easily sensible Accordingly, this paper aims to deal with RM of KMI project in an organization, concentrating on the risks particularly caused by the CP In this article, the Wiig model for KMI, adding project approach to it, is utilized in studying KMI project in an organization Moreover, PMBOK 2017 standard is used as a guide for how to perform RM of that project On top of that, this paper has conducted a case study on Dena Holding , as an Iranian organization, identifying and analyzing the new risks of KMI project in that organization specifically caused by the CP Furthermore, the responding strategy and actions regarding each of the risks have been determined Doing these has made it possible to notice the potential effects of the CP on the project under study Over and above that, it has been figured out that the project manager of the studied project should have an active approach to Project Risk Management PRM in this situation For doing so, the project manager, paying special attention to PRM, should try hard to minimize the negative consequences of the threats and maximize the positive consequences of the project's opportunities

کلیدواژه‌ها

Knowledge Management Coronavirus (COVID-19) Pandemic Project Management Knowledge Management Implementation Project Risk Management Coronavirus COVID 19 Pandemic

نویسندگان

تصویر Iman Naderi

Iman Naderi

M Sc Student in Industrial Engineering – Project Management, Amirkabir University of Technology Tehran Polytechnic , Tehran, Iran;

تصویر abbas afrazeh

abbas afrazeh

Associate Prof ; Department of Industrial Engineering and Management Systems, Amirkabir University of Technology Tehran Polytechnic , Tehran, Iran;

تصویر maryam ashrafi

maryam ashrafi

Assistant Prof ; Department of Industrial Engineering and Management Systems, Amirkabir University of Technology Tehran Polytechnic , Tehran, Iran;

شیوه ارجاع

Naderi, Iman and afrazeh, abbas and ashrafi, maryam,1400,Risk Management of Knowledge Management Implementation Project in an Organization under the Corona Virus (COVID-19)Situation – Case Study of "Dena Holding",Seventh International Conference on Industrial and Systems Engineering,Mashhad

ارائه‌شده در

پوستر مجموعه مقالات هفتمین کنفرانس بین المللی مهندسی صنایع و سیستم ها مجموعه مقالات هفتمین کنفرانس بین المللی مهندسی صنایع و سیستم ها17 شهریور 1400 · مشهد
ادامه مسیر پژوهش

مقالات مرتبط

مقاله کنفرانسی سال ۱۴۰۰ ۱,۳۱۶ مشاهده

بهبود رضایت مسافران خطوط هوایی به کمک بهینه سازی داده محور

مسافران خطوط هوایی عمدتا هزینه ای بیشتر در مقایسه با مسافران سایر ناوگانهای حمل ونقلی میپردازند و سطح تو…

بهبود کیفیت خدمات.رضایت مسافران خطوط هواییبهینه سازی داده محور
مقاله کنفرانسی سال ۱۴۰۰ ۱,۲۶۲ مشاهده

حل مدل برنامه ریزی ریاضی مسئله برش موجودی با توسعه یک الگوریتم ابتکاری (مورد مطالعه:کارخانه نورد شرکت صنایع مس شهید باهنرکرمان)

مسئله برش موجودی CSP ۱ یک مسئله بهینه سازی در ریاضیات است که از مسائل صنعتی ناشی میشود این نوع مسئله در…

الگوریتم ابتکاریبرش یک بعدیتولید الگو
مقاله کنفرانسی سال ۱۴۰۰ ۱,۲۳۵ مشاهده

مروری بر مدلسازی پارامتری در برآورد هزینه ی پروژه های ساخت با استفاده از روشهای هوش مصنوعی

یکی از اصلی ترین مشکلات پروژه های ساخت، عدم اتمام آنها برمبنای بودجه مصوب است برآورد هزینه ی پروژه های س…

برآورد هزینههوش مصنوعیمدلسازی پارامتری
مقاله کنفرانسی سال ۱۴۰۰ ۱,۲۱۲ مشاهده

شناسایی عوامل موثر بر ارتقاء زنجیره تامین ناب، چابک، تاب آور،پایدار (LARS) مطالعه موردی صنعت داروسازی گیاهی

زنجیره تامین لارس LARS ، به صورت هم افزا سعی در تقویت یکپارچه پارادایم های ناب، چابک، تاب آور وپایداردار…

تاب آورپایدارزنجیره تامین ناب
مقاله کنفرانسی سال ۱۴۰۰ ۱,۲۰۹ مشاهده

پایش میانگین طول عمر محصولات با استفاده از نمودارهای کنترل شوهارت و EWMA تحت آزمون طول عمر سانسورشدگی خرابی

نظارت بر مشخصه کیفی طول عمر تحت نمودارهای کنترل دو جنبه مهم دارد که طراحی یک نمودار کنترل را مشکل میکند…

طول عمرنمودارهای کنترلمیانگین طول دنباله
مقاله کنفرانسی سال ۱۴۰۰ ۱,۱۷۰ مشاهده

مدل مسیریابی ترکیبی با چند کامیون و چند پهپاد برای اجرای عملیات تحویل کالاهای امدادی

یکی از مسائل مهم روز، حوادث و رخدادهای طبیعی و آثار مخرب جانی و مالی مربوط به آنها می باشد با توجه به اه…

لجستیک بحرانمسیریابی ترکیبی پهپاد-کامیونوسایل نقلیه هوایی بدون سرنشین UAV