In the face of growing urban demands and resource constraints, civil engineering projects are increasingly exploring modern construction methods MMC as a strategic response to cost and scheduling challenges This study investigates the application and perception of MMC in Tehran’s construction sector, focusing on its effectiveness in improving project efficiency Using a mixed methods approach, data was gathered through surveys and interviews with industry professionals The results reveal that although traditional methods still dominate, the adoption of MMC—especially modular and volumetric systems—is gaining traction Findings show moderate consensus on MMC's ability to reduce project duration, while cost effectiveness remains a point of contention, largely due to high initial investments and inconsistent awareness of long term benefits The study concludes that while MMC offers substantial potential for time and cost control, broader adoption will depend on industry readiness, improved data transparency, and supportive policy frameworks
کلیدواژهها
نویسندگان
شیوه ارجاع
Gharehjeloo, Eilnaz,1404,Optimizing Cost and Time Control through Modern Construction Methods in Civil Engineering Projects: A Case Study from Tehran,Third International Conference on applied researches in civil engineering, architecture and urban planning
ارائهشده در
مجموعه مقالات سومین کنفرانس بین المللی پژوهش های کاربردی در مهندسی عمران، معماری و شهرسازی30 آبان 1404