A very important segment of the West coast railway extension is the tunnel project through the Hallandsهs Due to extremely difficultgeological conditions, the originally conceived tunnel construction design, with the idea to use a TB Machine had to be changed The tunnel is now drifted heading by blasting An extensive narrow gapand crack system crosses the ridge of the Hallandsهs and complicates the injection works After problematical trials to seal the rock against penetrating groundwater by chemical injection methods, now the project is continued by lining a test section of 2 × 500 m Main component of this sealing system is a 4 mm Carbofol® Tunnel Membrane, which is designed for a water column of 150 m
کلیدواژهها
نویسندگان
شیوه ارجاع
Shahkolahi, A and Meissner, M and Ghiasinejad, H,1388,Application of Carbofol® Tunnel Membrane Sealing System DWA-I in the Swedish Hallandsås Tunnel,08th Iranian Tunneling Conference,Tehran